Scope

Ductile Mains · HDPE Distribution · Valve Chambers · Disinfection Testing

Delivered

2025

Location

Al-Sisi City, North Sinai

Disciplines

Infrastructure Networks & Pipelines

Al-Sisi City Strategic Potable Water Supply & Distribution Network

Project Context & Requirements

Providing permanent potable water supply across the extensive development zones of Al-Sisi City in North Sinai demanded high-pressure transmission mains, storage reservoir interties, and neighborhood distribution loops under Contract 2025-Water.

Scope & Deliverables

01Large-diameter potable water transmission mains laid across primary urban corridors under Contract 2025-Water.
02High-density polyethylene (HDPE) secondary distribution network installed serving residential sectors.
03Reinforced concrete valve chambers equipped with air valves, gate valves, and pressure reducing stations.
04Full-system chlorination, disinfection, and pressure testing certified by water authority inspectors.

Process Schematic & Flow

The actual engineered treatment and transfer sequence implemented in this facility.

Process Flow & Technical Schematic
5 Process Phases
Step 01

Source Intake

Primary supply connection

Step 02

Trunk Mains

Large diameter transmission

Step 03

Strategic Storage

Buffer reservoirs

Step 04

Booster Station

Pressure boosting

Step 05Final

Local Distribution

Service area network

Engineered Process Sequence — Single-Contract DeliveryVerified Schematic
Al-Sisi City Strategic Potable Water Supply & Distribution Network
Al-Sisi City Strategic Potable Water Supply & Distribution Network
Al-Sisi City Strategic Potable Water Supply & Distribution Network
Al-Sisi City Strategic Potable Water Supply & Distribution Network
Al-Sisi City Strategic Potable Water Supply & Distribution Network

Delivered Outcome

Supplied, laid, and hydrostatically tested high-diameter ductile iron and HDPE water mains with air/gate valve chambers and booster connections.

Our Execution Standard

One partner · Full scope · Delivered as agreed.

Build with one accountable partner.

Direct access to our senior engineering leads. We review project tenders, perform feasibility assessments, and structure turnkey proposals.

Submit Technical Enquiry